Vehicle & Technical > Suzuki
v12 vit
suzota:
still a loooooooooooooooooooooooooooooooooooooooooooong way to go though.
suzota:
ugly sod or what.
one side of the transmition tunnel done.
dials in the dash
seat in place
thinking about welding a plate over the door opening.
not sure though :?: :?:
suzota:
dash is done and in. :D
new side panel is in as well.
its starting to get there at last. :D :D :D :D
bracing on the stinger.
not a very good side view as i cant get back far enough, but you can get a rough idea of the thing.
ecu is now fitted under the dash as well.
suzota:
well its under the truck, needs to be modded a wee bit as the rear sits 1/2 inch lower than the front at the mo.
might just bung some spacers on the rear :D
35 inch tyre in place and the axle at ride height.
loads of room.
rear bulk head under construction.
got myself a nice jaguar xjs fuel tank today.
fits a treat. :D
wrecker:
thats looking great mate,
keep up the great work :cool:
Navigation
[0] Message Index
[#] Next page
Go to full version